All the Southeastern trains cancelled due to engineering work this week

Some Southeastern trains will be cancelled, diverted or replaced by buses this week due to planned engineering work.

The work will affect trains from Monday (January 13) to Friday (January 17).

We have compiled all the details on these works so that you can plan your journey this week.

Monday to Thursday (January 13 to January 16)

The 11.50pm train from London St Pancras International to Faversham will be replaced by buses between Ebbsfleet International, Gillingham, and Faversham, calling at all stations except Higham, Newington, and Teynham.

From 11.30pm until the end of service, trains will be unable to run between Dartford and Gravesend.

Passengers can use Thameslink replacement buses between Dartford and Rainham at no extra cost.

From 11.50pm until the end of service, trains via Maidstone East will be diverted after Otford to run to or via Sevenoaks.

Replacement buses will run between:

  • Sevenoaks and Maidstone East, calling at all stations except East Malling

  • Maidstone East and Ashford International, calling at all stations

  • West Malling and East Malling, minibus shuttle

Lewisham area

Engineering work is taking place in the Lewisham area, closing various lines.

After approximately 11.15pm each night, trains will not call at Lewisham.

Trains via Bexleyheath will not run or will be diverted to run via Sidcup.

Trains will be unable to run between Lewisham and Hayes.

On Monday and Tuesday, trains on the Hayes line will be diverted after New Beckenham to Bromley South (except the last train at 12.09am from London Cannon St to Hayes service, which will not run).

Replacement buses will run on the following routes:

  • London Bridge and Dartford via Bexleyheath

  • London Bridge / Lewisham and Hayes (on Monday and Tuesday night only except for 12.22am train from Lewisham to Hayes which will run on Wednesday and Thursday night)

  • London Bridge and Dartford via Sidcup (12.50am from Lewisham only)

  • London Bridge and Orpington (1.10am from London Bridge only)

  • London Bridge / Lewisham and Charlton / Dartford via Woolwich Arsenal (Wednesday and Thursday only)

Tuesday to Friday (January 14 to January 17)

The 12.27am train from London Victoria to Orpington will be replaced by a bus between Bromley South and Orpington, calling at Bickley and Petts Wood.

The 4.30am train from Gravesend to London Charing Cross will begin at Dartford at 4.48am.

Passengers can use Thameslink trains between Gravesend and Dartford at no extra cost to connect with this train.

 

Image Credits and Reference: https://uk.yahoo.com/news/southeastern-trains-cancelled-due-engineering-050000201.html