New giant 45-metre wind turbine set to be built in Pembrokeshire

A call to replace a Pembrokeshire community wind turbine which has raised more than £76,000 for local groups with a larger one has been backed despite a recommendation to refuse.

In an application before Pembrokeshire County Council’s planning committee meeting of January 14, Abergwaun Community Turbine Ltd, through agent Machynlleth-based Dulas Ltd sought permission for a larger turbine to replace the existing Abergwaun Community Turbine.

The proposed turbine, in a pasture field at Trebover Farm, to the south of Fishguard, would be 67m tall, the existing 2015 one being 45 metres.

In supporting statements, parent company Transition Bro Gwaun said: “The Community Climate Fund (CCF) is the mechanism by which Transition Bro Gwaun (TBG) is fulfilling our ambition of funding projects in Fishguard, Goodwick and across North Pembrokeshire, using income from the community wind turbine.

“The core themes for grants are climate change mitigation and adaptation, enhancement of biodiversity and improvements to community resilience through promotion of community engagement and resource sharing.”

Profit generated by sale of electricity from the turbine is split 50:50 between TBG and Parcy-Morfa Farms Ltd through the jointly-owned trading arm, Abergwaun Community Turbine, with community grants awarded through TBG’s Community Climate Fund, amounting to £76,036 to date.

2024 awards of £20,917 were made to six projects, including Theatr Gwaun, Parc Cerrig Growers, Caerhys Organic Community Agriculture, and Nevern Valley Veg.

The scheme was recommended for refusal on the grounds including “significant detrimental visual impact” on the area, “including areas of high sensitivity in the Pembrokeshire Coast National Park and in Fishguard,” on the Conservation Areas of Goodwick, Fishguard and Lower Town, Fishguard.

At the January meeting, local member Cllr Jordan Ryan made a call for the scheme to be approved against officer recommendations: “I think it’s a good application, I think it’s good for Pembrokeshire; a single wind turbine isn’t going to affect people in the area too greatly.”

He was backed by Cllr Alistair Cameron, who said he supported the scheme due to “the need to tackle climate change and the economic benefit to the area,” adding: “We have to accept some visual consequences from that, that’s the reality we are in.”

Another in support was Cllr John T Davies, himself the owner of a windfarm scheme, who pointed out the existing turbine was granted on appeal, with any refusal of the latest scheme potentially being overturned by a planning inspector.

The committee’s unanimous backing of the proposal takes the form of a ‘minded to’ support, meaning the proposal will return after a ‘cooling-off’ period to a future meeting as it is against an officer recommendation, and, if supported a second time, will ultimately have to be decided by full council at a later date.

Image Credits and Reference: https://uk.yahoo.com/news/giant-45-metre-wind-turbine-120000548.html